See our latest updates
Latest News
Rolls-Royce Singapore has awarded MHA SEA Pte Ltd and ASS Pte Ltd with a contract to provide two heavy duty trolleys for engine assembly at the Seletar Assembly Plant in Singapore.
The trolleys will have the capacity to handle the Trent 1000 engine together with the build stand.
Further to a competitive tender, SATS Food Industries have awarded ASS with a contract to supply, install and commission replacement chains for part of the Overhead Cart Transport System Power and Free Conveyor located at the SICC2 facility.
The scope includes for two replacement chains with a total length in excess of 400 meters.
ASS showcased the ZoneSafe range of safety products at the Parcel Expo 2015 exhibition held at the Suntec City Convention Centre Singapore.
The exhibition was a success with many regional visitors welcomed to the ASS booth by the ASS sales and support team.
ASS will be taking the exhibition booth together with the demonstration equipment on a local ‘Road Show’ around Singapore. More information on upcoming events and dates will be published here.
Rolls-Royce Singapore have awarded MHA SEA Pte Ltd and ASS Pte Ltd with a 12 month contract to provide Preventive Maintenance Services for the Automated Flow Lines at the Seletar Assembly Plant in Singapore.
MHA and ASS will perform quarterly Preventive Maintenance checks and provide valuable system performance feedback to Rolls-Royce via comprehensive reports.
Rolls-Royce Singapore have awarded MHA SEA Pte Ltd and ASS Pte Ltd with a 12 month contract to provide Call-Out Support Services for the Automated Flow Lines at the Seletar Assembly Plant in Singapore.
MHA and ASS will provide call-out services on a 365 day x 24 hour basis.
MacDonald Humfrey showcased their Mach-Secure Integrated Airport Security Systems at the Inter Airports exhibition held at the Singapore Expo.
The exhibition was a success with many regional visitors welcomed to the MHA booth by the group MD Mick MacDonald, UK Director Keith Mills and SEA Director David Vass.
SATS Food Industries have extended the Preventive Maintenance and Support Contract for their Automated Systems located at the SICC2 facility, Changi Airport, Singapore. ASS Pte Ltd have been supporting SATS at this site since 2005. The extended contract includes for the support of the Cart Transport Management System (CTMS), the Cart Transport System (CTS), the Buffer Management System (BMS) and the Material Handling System (MHS). The full scope of work includes for comprehensive Preventive Maintenance, 365 day x 24 hr support both locally in Singapore and from the UK, 3rd party support for the Stratus ft Servers, Ethernet Networks, Modicon PLCs, RFID Tag Reading System and Anti Virus updates.
The contract awarded is for a period of 2 years + a 1 year option.
Further to a competitive tender exercise, SATS Catering Pte Ltd have awarded ASS Pte Ltd with a contract to upgrade the Programmable Logic Controllers (PLCs) and the RFID Tag Reading System associated with their Cart Transport System (CTS) at the SICC2 facility Changi, Singapore.
The existing Modicon 984 PLCs together with the associated 800 series I/O will be upgraded utilising the Modicon Quantum range of products. The existing system comprises 5 Modicon 984 CPUs and approx. 2000 I/O points. The upgrade allows for the existing Modbus Plus communications to be upgraded to TCP/IP.
The existing long range active RFID Tag Reading System will be upgraded to a short range passive system utilising the IDENT range of equipment as manufactured by Pepperl + Fuchs. There are 98 Tag Readers and 30 IDENT Decoders associated with the system.
The upgraded Tag Reading System will communicate to the PLCs via the TCP/IP protocol.
The overall upgrade will enable the entire CTS control system to communicate to the previously upgrade Cart Transport Management System (CTMS) via TCP/IP.
The project will be carried out in phases with an anticipated completion date of November 2014.
Rolls-Royce Singapore have entered into a framework agreement with MHA SEA Pte Ltd and ASS Pte Ltd for labour and services at the Seletar Assembly Plant in Singapore.
This agreement has been put in place to compliment the 365 x 24 hour call-out service previously awarded.
Rolls-Royce Singapore have awarded MHA SEA Pte Ltd and ASS Pte Ltd with a 12 month contract to provide Preventive Maintenance Services for the Automated Flow Lines at the Seletar Assembly Plant in Singapore.
MHA and ASS will perform quarterly Preventive Maintenance checks and provide valuable system performance feedback to Rolls-Royce via comprehensive reports.
Rolls-Royce Singapore have awarded MHA SEA Pte Ltd and ASS Pte Ltd with a 12 month contract to provide Call-Out Support Services for the Automated Flow Lines at the Seletar Assembly Plant in Singapore.
MHA and ASS will provide call-out services on a 365 day x 24 hour basis.
Rolls-Royce Singapore have awarded MHA SEA Pte Ltd and ASS Pte Ltd with a contract to provide an Andon Call System for their Engine Module Build Area at the Seletar Assembly Plant in Singapore.
The Andon System will allow local machine and assembly operators to call for Supervisor or Parts assistance via push button stations. MHA and ASS will provide 5 Area Compact PLC Control Panels to accept the input calls and drive output signals for warning klaxons/speakers and beacons.
The system is being designed for future expansion whereby a SCADA System will be deployed to enable centralized monitoring and data analysis.
Exmac Automation Ltd and MHA Ltd have awarded separate contracts to ASS Pte Ltd to provide mechanical and control services associated with the installation of a new work platform at the Vertical Core (VC) Flow Line. The VC Flow Line was originally installed in 2011 and the new platform assists Rolls-Royce to meet their anticipated production demands.
The new work platform, which will be installed and commissioned during the period December 13 to January 14, is a replica of the recently installed platforms at the Rolls-Royce Derby UK facility.
Rolls-Royce Singapore have awarded MHA SEA Pte Ltd and ASS Pte Ltd with a contract to extend the alluminium work decks associated with their CDC Flow Line at the Seletar facility. The work decking that runs alongside the Flow Line is to be further extended by approx. 675 sq ft. providing additional space for Rolls-Royce to install intelligent work stations. The project includes for the relocation of existing, and installation of new services for both power and Ethernet.
ASS have signed an agreement with Avonwood Solutions Ltd to be the distributor of their ZoneSafe product range in the SEA region. ASS will carry out all marketing and product support activities from their Singapore office. ASS are equipped with full demonstration kits, technical data and technical manuals.
For the full information regarding the ZoneSafe product range please visit www.zonesafe.net
Data sheets are available at the downloads section of this site.